M03 | production | Công ty TNHH Phương ngọc
Cài đặt
Tên lắp đặt : M03
Mã : 5
M03


Download installation guide
IG-A-Cement
(34.28 kB)
M03_det1 M03_det2 M03_TKH
     
Quantity specification (excl. wastage)
Installation diagram (M03) Focus B, using A-cement
  Size, mm
  600x600
1 Ecophon Focus B 2,8/m²
2 Connect A-cement, (diameter 40 mm) 0,9l/m²
3 For use when installing floating ceilings: Connect Wood trim, L=2500 mm, fixed at 500 mm centres as required
Min. overall depth of system: 23 mm -
Min. demounting depth: The system is non-demountable -
Visible edges should be painted -