Cài đặt
Tên lắp đặt : M03
Mã : 5
Mã : 5
| Download installation guide |
| IG-A-Cement |
| (34.28 kB) |
Quantity specification (excl. wastage)
Installation diagram (M03) Focus B, using A-cement
Installation diagram (M03) Focus B, using A-cement
| Size, mm | |
| 600x600 | |
| 1 Ecophon Focus B | 2,8/m² |
| 2 Connect A-cement, (diameter 40 mm) | 0,9l/m² |
| 3 For use when installing floating ceilings: Connect Wood trim, L=2500 mm, fixed at 500 mm centres | as required |
| Min. overall depth of system: 23 mm | - |
| Min. demounting depth: The system is non-demountable | - |
| Visible edges should be painted | - |
